Select a Section

News & Updates All »

BRIDGE CLOSURE: INDIANA AVENUE

Wednesday, July 28, 2021

The Indiana Avenue bridge just north of Wilden Avenue will be closed from August 2 through August 6 to allow to seal the coat of the deck. The dates are weather permitting, and it is not anticipated for the work to take the whole week. more

Notice of Adoption of Ordinance 5090, County Road 36 Annexation

Tuesday, July 27, 2021

Ordinance 5090, County Road 36 Annexation, was passed by the Goshen Common Council on July 20,2021 and approved and adopted by Mayor Jeremy P. Stutsman. The annexation area consists ofapproximately 163 acres of real estate generally located along both the north and south sides of CountyRoad 36, west... more

ROAD CLOSURES: WEEK OF JULY 19

Wednesday, July 21, 2021

COLONIAL MANOR DRIVE: Colonial Manor Drive is closed between Bashor Road and William Drive until Friday, July 23 (weather dependent) to allow a full depth asphalt road replacement on the road. The road is closed except to local residents. 16TH STREET: 16th Street, between Fairfield Avenue and... more

Upcoming Events All »

Board of Works & Safety & Stormwater Board

Monday, August 2, 2021, 2:00pm

Please click the link below to join the webinar: https://us02web.zoom.us/j/88677698824 Or Telephone: (301) 715-8592 or 312 626 6799 Webinar ID: 886 7769 8824 Dial *9 to "raise hand" and speak during public comment

City Council meeting

Tuesday, August 3, 2021, 6:00pm

To view a live stream of this meeting, go to https://us02web.zoom.us/j/83525446373 or call (312) 626-6799 or (929) 205-6099 and dial the meeting ID: 835 2544 6373. To speak during the public meeting, the public should use the “raise hand” feature on meeting or dial *9 if calling on the telephone.

Board of Works & Safety & Stormwater Board

Monday, August 9, 2021, 2:00pm

Please click the link below to join the webinar: https://us02web.zoom.us/j/88677698824 Or Telephone: (301) 715-8592 or 312 626 6799 Webinar ID: 886 7769 8824 Dial *9 to "raise hand" and speak during public comment

Wilden Avenue

The Wilden Avenue Reconstruction project, Des. No. 1400715 will span from the Rock Run Creek bridge to approximately 100 feet east of 5th Street.

Click here to see drawings of the proposed project.

The purpose of the project is to

  • Improve pedestrian safety and mobility along Wilden Avenue
  • Improve traffic flow and truck access at the intersection of Wilden Avenue and SR 15
  • Provide adequate drainage
  • Improve the asphalt pavement

The proposed project includes new pavement with curb and gutter and new sidewalks, construction of a new storm sewer, and realignment and widening of Wilden Avenue at Main Street. The project would begin on the east side of Rock Run Creek and continue to approximately 100 feet east of 5th Street. The construction of the project is expected to cost approximately $5,500,000.

Approximately 1.4 acres of permanent right of way and 0.53 acres of temporary right of way are anticipated for construction. Four residences would be relocated as a result of the project. 

During construction, Wilden Avenue will be closed to through traffic and detoured around the project limits. Access will be maintained at a minimum of one street crossing between Rock Run Creek and Main Street at all times. Access to all properties will be maintained during construction.  

All interested parties are hereby notified of the availability of the environmental document and preliminary design plans for review at the following locations:

  • Goshen Engineering Department, 204 E. Jefferson Street, Goshen, IN 46528
  • Abonmarche Consultants, 1009 South 9th Street, Goshen, IN 46526
  • Goshen Public Library, 601 South 5th Street, Goshen IN 46526