Select a Section

News & Updates All »

Goshen Parks and Rec hosts Breakfast with Santa and other holiday events

Monday, November 18, 2024

The Goshen Parks and Recreation Department is celebrating the holiday season with events throughout the next two months, including a Breakfast with Santa on Saturday, Dec. 7, at 10 a.m. at Schrock Pavillion, 411 W Plymouth Ave.  Parents are encouraged to bring their kids to enjoy a full... more

Invitation for Bids: Purchase of Uplift Equipment 2025 Ford Explorer Hybrid PPV

Friday, November 15, 2024

The City of Goshen, Indiana is soliciting sealed proposals until December 12, 2024 at 4:00 p.m. (local time) for the above referenced purchase in accordance with the detailed specifications included in the Specification and Contract Documents.  Specifications and Contract Documents for this purchase... more

Goshen Fire Department Honors Chief Dan Sink, Welcomes Chief Anthony Powell in Change of Command Ceremony

Friday, November 8, 2024

Mayor Gina Leichty swears in Chief Anthony Powell The Goshen Fire Department celebrated a significant transition in leadership Friday night with a formal Change of Command ceremony, honoring retiring Chief Dan Sink’s 43 years of service and welcoming incoming Chief Anthony Powell. Held at the... more

Upcoming Events All »

Board of Works

Today, 4:00pm

To join the webinar please copy and paste this link on your browser: https://us02web.zoom.us/j/88469251269

Traffic Commission

Today, 4:30pm

This meeting is in-person only.

Shade Tree Board

Monday, November 25, 2024, 7:00pm

This meeting is in-person only.

Wilden Avenue

The Wilden Avenue Reconstruction project, INDOT Des. No. 1400715, will span from the Rock Run Creek bridge to approximately 100 feet east of 5th Street.

Click here to see drawings of the project.

The purpose of the project is to:

  • Improve pedestrian safety and mobility along Wilden Avenue
  • Improve traffic flow and truck access at the intersection of Wilden Avenue and SR 15
  • Provide adequate drainage
  • Improve the asphalt pavement

The project includes new pavement with curb and gutter, new sidewalks, construction of a new storm sewer, and realignment and widening of Wilden Avenue at Main Street. The project will begin on the east side of Rock Run Creek and continue to approximately 100 feet east of 5th Street. The construction of the project is expected to cost approximately $5,500,000.

Approximately 1.4 acres of permanent right-of-way and 0.53 acres of temporary right-of-way are anticipated for construction. Four residences would be relocated as a result of the project. 

During construction, Wilden Avenue will be closed to through traffic and detoured around the project limits. Access will be maintained at a minimum of one street crossing between Rock Run Creek and Main Street at all times. Access to all properties will be maintained during construction.  

All interested parties are hereby notified of the availability of the environmental document and preliminary design plans for review at the following locations:

  • Goshen Engineering Department, 204 E. Jefferson Street, Goshen, IN 46528
  • Abonmarche Consultants, 1009 South 9th Street, Goshen, IN 46526
  • Goshen Public Library, 601 South 5th Street, Goshen IN 46526

Construction Updates:

  • June 26, 2023 Update Letter 

                                                      (English)                                                                               (Español)                          

                                          

 

Click here to download the above letter or click on each page to see a larger image. 

Haga clic aquí para descargar la carta o haga clic en cada página para ver una imagen más grande.

 

  • March 17, 2023 Update Letter 

(Español)

Haga clic aquí para descargar la carta o haga clic en cada página para ver una imagen más grande.

(English)

Click here to download the above letter or click on each page to see a larger image.