The City of Goshen strives to take the best care for residents and to ensure our drinking water meets all U.S. Environmental Protection Agency (EPA) and Indiana Department of Environmental Management (IDEM) safety requirements.  As part of this process, the EPA will conduct community interviews in Goshen... more

2024 Spring brush pick-up begins April 22

Monday, April 15, 2024

The City of Goshen Street Department will begin the Spring brush pick-up on Monday, April 22, and will run until Friday, May 3, 2024. Please have any yard brush and leaves out before the start date to ensure pick-up. Leaf and brush piles placed in alleyways will not be picked up. Because of the large... more

Beautify Goshen Week 2024

Tuesday, April 9, 2024

In conjunction with the Goshen Chamber of Commerce’s “Beautify Goshen” Week, the Goshen Street Department will offer additional disposal services from Saturday, April 27, to Saturday, May 4, to assist city residents in their “Beautify Goshen” tasks. This free service is only available during this... more

Upcoming Events All »

RESCHEDULE: Board of Aviation Commissioners

Monday, April 22, 2024, 2:00pm

City Council

Monday, April 22, 2024, 6:00pm

To view a live stream of this meeting, go to https://us02web.zoom.us/j/81652777559 or call +1 305 224 1968, Webinar ID: 816 5277 7559. Comments are no longer taken online. https://us02web.zoom.us/j/81652777559

Shade Tree Board

Monday, April 22, 2024, 7:00pm

This meeting is in-person only.

Wilden Avenue

The Wilden Avenue Reconstruction project, INDOT Des. No. 1400715, will span from the Rock Run Creek bridge to approximately 100 feet east of 5th Street.

Click here to see drawings of the project.

The purpose of the project is to:

  • Improve pedestrian safety and mobility along Wilden Avenue
  • Improve traffic flow and truck access at the intersection of Wilden Avenue and SR 15
  • Provide adequate drainage
  • Improve the asphalt pavement

The project includes new pavement with curb and gutter, new sidewalks, construction of a new storm sewer, and realignment and widening of Wilden Avenue at Main Street. The project will begin on the east side of Rock Run Creek and continue to approximately 100 feet east of 5th Street. The construction of the project is expected to cost approximately $5,500,000.

Approximately 1.4 acres of permanent right-of-way and 0.53 acres of temporary right-of-way are anticipated for construction. Four residences would be relocated as a result of the project. 

During construction, Wilden Avenue will be closed to through traffic and detoured around the project limits. Access will be maintained at a minimum of one street crossing between Rock Run Creek and Main Street at all times. Access to all properties will be maintained during construction.  

All interested parties are hereby notified of the availability of the environmental document and preliminary design plans for review at the following locations:

  • Goshen Engineering Department, 204 E. Jefferson Street, Goshen, IN 46528
  • Abonmarche Consultants, 1009 South 9th Street, Goshen, IN 46526
  • Goshen Public Library, 601 South 5th Street, Goshen IN 46526

Construction Updates:

  • June 26, 2023 Update Letter 

                                                      (English)                                                                               (Español)                          

                                          

 

Click here to download the above letter or click on each page to see a larger image. 

Haga clic aquí para descargar la carta o haga clic en cada página para ver una imagen más grande.

 

  • March 17, 2023 Update Letter 

(Español)

Haga clic aquí para descargar la carta o haga clic en cada página para ver una imagen más grande.

(English)

Click here to download the above letter or click on each page to see a larger image.