The following is a press release from the Indiana Department of Transportation:
The Indiana Department of Transportation announces that bridge maintenance is scheduled for S.R. 119 over the Elkhart River, in Elkhart County, on or after Monday, June 17, weather permitting.
Beginning Monday, motorists may experience alternating lane restrictions and traffic directed by flagger or temporary signal between South Indiana and South 3rd streets. Be prepared for stopped traffic and vehicles entering or exiting the work zone. INDOT reminds drivers to use caution and consider worker safety when driving through an active construction zone.
Work on the S.R.119 bridge over the Elkhart River is expected to continue through late June, weather permitting. The contract was awarded to Pioneer & Associates for $573,000 and includes maintenance on several structures across the Fort Wayne District.